more electrical, drywall, painting, microwaves

So today’s activities include drywalling. In order to do that, I had to reroute some of the wires in the breaker panel so the drywall would fit. Well, if I’m doing that, I might as well label on my circuit numbers.

Once all that is done, I can finally hang my upper cabinets. However, that means I have to paint first.

 

Then I can finally see if my microwave fits.

A tenant gave back a microwave oven a couple of days ago.  Apparently no one wants them!

Leave a comment