Double-header, instep king studs, and a couple of cripples.
Next: cut the window hole and add the window. The nail flange will have to be tucked inside the siding somehow.
After that, add a one-by frame, drywall, tape, mud, sand, skim -coat, sand again, paint, and trim. Almost done. Ha.
In the mean time, while I wait forĀ FT, I’ll be painting the ceiling again. The touch-up paint I used a couple of days ago froze in the van and changed colour.
Final coat?