Another trip to the landfill, this time with 596kg, mostly old wood and plaster.
After the dump run, FT and I worked on tearing out the rest of the ceiling nails from the roof trusses.
2/15/2025 12:52 PM 3246190 1403 3 Ave N Lethbridge AB up 20250215_125209 roof trusses.jpg 2/15/2025 5:17 PM 2660152 1403 3 Ave N Lethbridge AB up 20250215_171757 roof truss ceiling nails.jpg 2/15/2025 5:18 PM 1102801 1403 3 Ave N Lethbridge AB up 20250215_171820 Allan pulling roof truss ceiling nails.jpg 2/15/2025 5:18 PM 3472656 1403 3 Ave N Lethbridge AB up 20250215_171829 Floyd pulling roof truss ceiling nails.jpg
And this is how the living room, kitchen, and bedroom look now.
![]() |
![]() |
![]() |
Almost finished! (Right.)