insulation, cleanup, vapour barrier

We finally insulated around the electrical panel.

 

I thought we were going to add another outside receptacle billed to the second floor, but I decided against it.  12-2 wire is expensive.  (No, I’m not running 50′ of 14-2 to plug in a vehicle block heater that uses close to 15 Amps.) 

Lots of clean-up and organization of tools, materials, equipment, etc.  I only had three hours between other work, so not a lot was done. 

But we did manage to put up the first vapour barrier in bedroom 1, so that’s a little progress.  No pic for some reason.  Probably in a hurry to get out the door.