living room trim

The baseboard 1x8s are ready now – routered, stained, and urethaned, so we put them up.  Because the floor is not really level across about 24 feet (7.3m), there were adjustments needed.  It turned out to be easiest to cut them into specific lengths to match the straight parts of the floor.

 

The rear deck post is fixed now, too.

Leave a comment