vanity plumbing, drywalling

Now comes the piecing together all the parts for the vanity.  I hope this works!

 

There were tonnes of pieces of drywall leftover from 1403.  My goal was to use up as much of this little pieces as possible.  The downsize is that I end up skim-coating large swaths of wallboard.  🙁

more electrical, drywall, painting, microwaves

So today’s activities include drywalling. In order to do that, I had to reroute some of the wires in the breaker panel so the drywall would fit. Well, if I’m doing that, I might as well label on my circuit numbers.

Once all that is done, I can finally hang my upper cabinets. However, that means I have to paint first.

 

Then I can finally see if my microwave fits.

A tenant gave back a microwave oven a couple of days ago.  Apparently no one wants them!

today’s tasks: vents, wiring, glue

Today’s tasks are installing roof gable vents, running wiring for the new electric water heater and three outside receptacles, and putting down glue for the kitchen, hall, closets, and bathroom flooring.  I only arrived here at 12 noon, so we’ll see how far I can get.  It’s not 35 degrees outside today, so I won’t cook in the attic.