living room trim

The baseboard 1x8s are ready now – routered, stained, and urethaned, so we put them up.  Because the floor is not really level across about 24 feet (7.3m), there were adjustments needed.  It turned out to be easiest to cut them into specific lengths to match the straight parts of the floor.

 

The rear deck post is fixed now, too.

kitchen floor done

Floyd and I completed the kitchen floor today. I think it looks really good.

 

There were some pieces that needed to be cut into odd shapes, but most were simply laid down as-is.

Next: complete the rear entry / laundry room.

 

final bit of subfloor

I’m piecing together the final bit of subfloor not before leveling and glueing the vinyl plank flooring. The home stretch? I hope so.

Floyd is going out for lunch with Terry, so it’s just me for now.

decking screws

I finally have all I need to complete the flooring., Including the cup of coffee. No, I don’t have the nail gun yet. Still waiting. So I picked up a box of decking screws to finish mounting the proboard.

 

first light & various electrical

I see the light!  FT and I installed the suite’s first light.  I decided on 4″ flush-mount LEDs throughout.  Also, the first tearing out of old electrical to make way for new circuits, including a 15A GFCI for the kitchen.  I’m getting pretty agile at crawling through the attic space.