We continued furring the framing to accommodate thicker insulation. The living room is a bit chilly right now.
The corners needed backing to allow for drywall.
This continued on into the evening.
12/29/2024 2:25 PM 288189365 1403 3 Ave N Lethbridge AB up 20241229_142329 Allan adding BR drywall backing.mp4





