bathroom drywall half complete

Before drywall gets put up, the shower faucet needs to be reinforced.  Likely nothing would ever go wrong with it, but one never knows. 

The transition between above and in front of the shower needs attention.  The framing in the east wall of the bathroom / living room add-on was pretty uneven.  The short strip of drywall is a split the difference kind of scenario, so a wide transition mud was necessary. 

A few hours later, and this is what we have. 

Next, the dryer and bathroom fan vent bulkheads need to be built.  Because they are both outflow vents, they can be side-by-side. 

The laundry area back wall is boarded now, including the top strip.  (The wall is 99 1/2 inches.)