BR2 boarded, mudded, taped

New pan and knife: 

Can’t find my old ones!  They’re probably rusty by now.  520 was a long time ago. 

So bedroom 2 is now done being boarded, taped, mudded.  For those who don’t know what these words mean: 

  • board – New drywall 4′ x 8′ sheets (boards) are attached to the wall studs.  The edges must line up with wall studs (or furring strips) to attach – they cannot just hang in the middle between studs.  1-1/4″ Philips drywall screws are used.  A screw setter is used to govern depth of the screw. 
  • mud – Drywall compound (mud) is mixed with a little water.  No, this is not the old style powder that is mixed with water – it is premixed – but it is too thick to use when taping.  Screw holes, seams, and any other holes and gaps are filled. 
  • tape – A layer of this thinner mud is applied to joints, then paper “tape” (no, not sticky on one side – just paper) is added and smoothed out with a knife (no, not a knife that you would think – a putty knife). 

Later, a “skim coat” (even thinner mud) will be applied and, later once dried, sanded to a smooth finish to paint. 

Bedroom 2 boarded, taped, mudded 

 

Bedroom 1 half done