2nd floor work begins

The second floor is rented for Sept. 31, 2026.  I’d best get a move-on. 

I priced out a water heater from Home Depot.  I think it may be too tall.  I’ll have to think on it. 

The entrance, stairway, and all the rooms are chocked full of stuff that needs to be moved, removed, organized, or used. 

We’re almost done!  (Not!) 

The panel needs improvements, mostly to get up to code.  Protector plates (“bang plates”) were added to various walls. 

Do I clean up or start construction?  I began drilling holes in the hinge for the storage area under the landing. 

Cleanup won out.