The plumbing for the laundry was finally completed. Since moving the washer box from the north wall to the west wall, the plumbing inside the wall also took forever, but it had to be done before the drywall could be put up. Dave patiently waited for me to complete that, but there was no time to complete it down below.
Also in the bathroom, the toilet shelving was run through the planer and router. They were 120-year-old wood planks used in the basement as a retainer wall. Now they are repurposed. I’m not sure if I’ll use polyurethane or resin to finish them.
They are not mounted yet. Just a dry run.
Now, on to the next task.