I ran a bundle of old lathe boards through the planer and polyurethaned them. These will become trim for the upstairs suite at 1403.
When my arms have healed a bit more, I’ll resume work there. Here is my to do list.
To Do (2026-10-07) (֍ = urgent)
1403
Main
1. ֍ lift veranda
2. ֍ build veranda floor
3. repair rear doorbell
4. add wall, door to veranda
Up
1. install doorbell
2. drywall entrance
3. build attic hatch, paint, attach insulation
4. paint stairway, upper landing
5. trim interior – baseboard, window, door
6. apply door filler
7. attach baseboard heaters
8. attach mid landing stair hinge
9. install flooring
10. install microwave oven
11. add handrail
Property
1. ֍ cut rear entrance add-on rafters
2. paint exposed wood
3. organize shed
4. finish placement of rocks around veranda hole, south wall
5. move bricks
6. deal with wood behind house
7. complete exterior window trim boards
8. replace rear motion light
9. ֍ fix downspouts
10. build soffit, fascia, add gutter
11. ֍ add fascia board
12. ֍ attach gutters, downpipes
13. ֍ seal (silicone) downpipes
14. add soffit covers
520
Main
1. fix dryer
2. ֍ complete rear walkway
Rear
1. complete siding
2. ֍ seal baseboards (bathroom)
3. connect downspouts
Property
1.
General
Bring / Buy
1.