fence post cement

We’re mixing cement today, putting in the last (hopefully) fence posts.

All went well enough except the last post – too many roots.  The hole was in the wrong place because the roots pushed pushed the power auger off to one side.

Now what?  Next time I’ll cut the roots off as far down as I can and complete the job.

new rear walkway afoot

Okay, so the puns aren’t great.

The new walkway from the rear of the house to the parking area is underway.  Floyd and I went to Lethbridge Landscape Supply for some gravel.  The guy there calculated how much we would need – 0.6 cubic yards.  We slowly drove back with 1.071 tonnes of ‘fractured road crush gravel’ loaded onto the trailer and shovelled it in, wheel barrow by wheel barrow, into the bed.

After reshaping the bed a little, we found it was too shallow.  The 2’x2′ concrete slabs weren’t level with the gazebo concrete.  We stole some gravel from another place until it was level.  The end result:

Next:  turning part of the gazebo into a walkway.

fence, concrete removal

Wouldn’t you know it – a piece of concrete is exactly the same place as a future fence post!  I bought a blade for cutting concrete ($55, Rona) and, with Floyd pouring water, cut it in line with the rest of the concrete.  This was my first time cutting concrete.

It wasn’t bad, but I now know to cut full-depth rather than just an inch deep at a time.  Why?  Cutting only an inch deep creates enormous heat on just the outer 1 inch of the blade causing warping.  Cutting at full-dept, heat is evenly distributed throughout the blade.

rear fence plan

I did the ‘call before you dig’ (or now they call it ‘click before you dig’) and hung up my permit notices.  I marked the proposed fence line with marker paint.

Of course, this line will likely change, depending on the utility location markers when they come to mark, the tenant(s), Floyd’s advice, and my ongoing vision for the place.  It will change the rear entrance pathway for the guys in the house and the rear tenant’s entrance.

I’m still a little undecided on where the fence should be.  Originally, I envisioned a motorized sliding gate, keeping vehicles inside the fence line.

The neighbour down the alley has this fence.  It looks like it has been disused for some time.

This project will likely prove to be too complicated and costly.  So best go with an ordinary fence inside the property with the vehicles outside.

fence line marked

I haven’t done much work on 520 for a while because I’m waiting for the ‘call before you dig’ people to do their inspections.  They will flag the area for all utilities (gas, electricity, cable, phone, water, sewer).  Until that happens, I wait.  Until then, I marked the area where the fence will be constructed.

I have a feeling that, under the gazebo, there is a septic tank.  Just a feeling.  There’s all manner of other junk buried back there.

more concrete and wood junk

It never ends!  More concrete, wood, and other building materials are gathering up.  Time for a dump run.

 

To put up a fence, we have to create a walkway from the house to the rear.  This means digging up earth, roots, rocks, foreign junk, and whatever else is in the way.  Paving stones will be put in and will lead to the rear parking.

 

Holy crap, are there a lot of roots!

 

We’ve flagged it off and will try again another day.