first light & various electrical

I see the light!  FT and I installed the suite’s first light.  I decided on 4″ flush-mount LEDs throughout.  Also, the first tearing out of old electrical to make way for new circuits, including a 15A GFCI for the kitchen.  I’m getting pretty agile at crawling through the attic space.

 

1403 3 Ave N begins

The significance of this picture is strong. 

It marks the beginning of a project at 1403 3 Ave. N. Lethbridge, AB, Canada, December 3, 2021

Here is the house two days after purchase. 

(Disclosure – on June 5, 2026, today, I’m going through old pictures.  This posting is retrospective.  In fact, when you see a posting timestamped at 22:00, it means it was written after-the-fact.)