Today’s project: hooking up plumbing for the vanity (a.k.a. bathroom sink), toilet, and kitchen sink.
projects on the go
Today’s project: hooking up plumbing for the vanity (a.k.a. bathroom sink), toilet, and kitchen sink.
So today’s activities include drywalling. In order to do that, I had to reroute some of the wires in the breaker panel so the drywall would fit. Well, if I’m doing that, I might as well label on my circuit numbers.
Once all that is done, I can finally hang my upper cabinets. However, that means I have to paint first.
Then I can finally see if my microwave fits.
A tenant gave back a microwave oven a couple of days ago. Apparently no one wants them!
Today’s tasks are installing roof gable vents, running wiring for the new electric water heater and three outside receptacles, and putting down glue for the kitchen, hall, closets, and bathroom flooring. I only arrived here at 12 noon, so we’ll see how far I can get. It’s not 35 degrees outside today, so I won’t cook in the attic.
There are cracks in the basement walls.
520 12C St N Lethbridge AB main 20230711_160812 view of front from BR1.mp4 520 12C St N Lethbridge AB main 20230711_161101 rain, cracks in basement wall, down spout.mp4 520 12C St N Lethbridge AB main 20230711_164621 crack in basement wall e1.mp4
These won’t make the house fall down as there are giant i-beams holding it up, but something must be done to move the torrential rains away from the house.
The new gutters certainly help, but the flow from the down pipes must be moved farther away.