One of the heat ducts became loose.
Outlets were attached.
Paint began on the doors.
The door for bedroom 2 was maladjusted. How? It was put in before the house was straightened and levelled, so, thus, it was realigned with the world.
The bathroom door was painted along with the bedroom 2 door.
Window frames were also painted.













