The bedroom 2 door got a second coat of paint, as did the bathroom.
Dave patched up the difficult area beside the front door. There isn’t a lot of room for corner bead.
The living room trim continued. The cable connector plate was added.
It seems that no one had emptied the washing machine filter in a long time. Disgusting.
The next task is to mix resin for the toilet shelving. Ordinary polyurethane won’t have the same effect. We’ll see how well it cures overnight.










