paint, mud, trim, debris, resin

The bedroom 2 door got a second coat of paint, as did the bathroom. 

Dave patched up the difficult area beside the front door.  There isn’t a lot of room for corner bead. 

The living room trim continued.  The cable connector plate was added. 

It seems that no one had emptied the washing machine filter in a long time.  Disgusting. 

The next task is to mix resin for the toilet shelving.  Ordinary polyurethane won’t have the same effect.  We’ll see how well it cures overnight.