Now that the corner of the house is more-or-less shored up, we can begin in the main floor.
We ripped the 2×10 20′ (6.096m) today. It is the longest rip I’ve ever done. Everything else has been 16′ (4.8768m). I had to buy 2x10s as the 2x8s in this house are 8 9/16″, and ordinary 2x8s are 8 1/4″. They would be either too short or not tall enough. (What?) What I mean is, it would either miss the subfloor above or the drywall below. So we rip.
The old floor joists in the original staircase location back when it was a 4-square house have been taken out. They were a mish-mash of pieces added as time went on. When we repaired the 2nd floor landing a few months back, we, yet again, pieced some pieces in. I regret that now. They should all have been replaced by real joists, ones that run the maximum span possible, from balloon stud to stair header.