KM is gone. He’d rented for just over two years, right after RG left. I’ll miss you, KM!
A quick look around.
projects on the go
So we bought all that cement board siding (Hardie Board) for the exterior of 520 rear. But, after adding continuous (no furrow strips) soundproofing and insulation, the width of the wall is now extended 2-7/8″ past the sheathing, or 3-1/4″ past the studs, which are only 2×4. What kind of hardware is needed to hang cement board siding that far out from the studs? Once the calculations are done, the cement board siding comes in at 93 lbs. per 4×8′ area.
Sheathing is exposed, making it a good time for adding wiring for baseboard electric heating. It wasn’t added before the drywall was put in because the drywall already existed. The heat pump system needs a backup, and it happens that the house had many leftover electric baseboard heaters after switching to a gas furnace.
The first sheathing (a.k.a. sheeting) hole was cut, allowing wiring to be connected into the panel.
Further holes were cut into the sheathing along the east side of the building.
More work to come.
Some of the wild flower seeds must have been what Sandra has identified as “wild lettuce”. They grow like trees! Now my fruit trees are inundated by what amounts to giant weeds. I’ll have to pull some.
Some of the shrubs in the front, next to the sidewalk, have died off. I pulled four dead shrubs and kept two that were half-dead. I’ll have to trim them sometime. In the mean time, I watered the two new shrubs. I hope they take.