We continued with the window, door,and floor trim.
The floor levelling compound is showing signs of drying.
The crack mud is also drying.
And now … the bedroom doors. The problem is that the bedroom 1 door is too tall. Why? Was the framing done incorrectly? Likely. I’ll continue measuring tomorrow.
There is work to be done at 520.