Rona+, protector plates and paper, living room window, range outlet

Rona+ is the only place I could find that sells whole boxes of protector plates (“bang plates”).  They hardly have any staff there.  Their app is broken – doesn’t accept my email and password despite being told several times over the past two years – so I can’t look up which isle and bay a product sits.  I must stand at customer service way longer than should be before someone speaks to me.  Their flooring guy in particular is the most miserable person I’ve ever met in retail, pushing me to go to End Of the Roll.  In short, I hate this place. 

Here’s a view of the new living room window.  Looks good, I think.  Just needs to be permanently installed before it falls out. 

I put down some fresh paper.  But this paper is too thin and rips easily underfoot (not from Rona+ but from Home Depot). 

Read more

begin ceiling drywall

On to the ceiling.  But first, move the boxes full of flat-pack cabinets that are in the way.

There is no rafter tie on the west end of the house.  A spacer (1″) and backing (2×4 on-the-flat) were added for mounting the ceiling drywall. 

Floyd came by and offered a badly needed 3rd set of arms. 

Read more

drywall day

More drywall from Home Depot.  There is a small discount if you buy 20 or more sheets (like 1-1/2 sheets free). 

Protection plates were added to the wiring before drywall goes up.

Read more

electrical upgrades to code

The inspector was by today, looking at the work previously done and, thankfully, on the same permit, did a rough-in inspection.  He was quite an agreeable fellow, addressing all my questions.  So was Ryley, the electrician from Passey Electric.  He found some deficiencies. 

  • Sep 11/2026 10:10AM (KEN) ROUGH IN: Range box and dryer box needs to have a second support. KF
  • Sep 11/2026 10:11AM (KEN) ROUGH IN: Plug in kitchen area should be taken out on opposite side of panel. KF
  • Sep 11/2026 10:13AM (KEN) ROUGH IN: Rough in of the upper unit was inspected with noted deficiencies. KF
  • Sep 11/2026 10:15AM (KEN) ROUGH IN: 3 heat pumps and 2 baseboard heaters are being installed. KF
  • Sep 11/2026 10:16AM (KEN) ROUGH IN: Fire alarm cable going downstairs to be completed. KF
  • Sep 11/2026 10:05AM (KEN) ROUGH IN: DEFICIENCY: Rule 12-3010 (2) – Gangable boxes require a second support between studs ( could be factory boxes2 gang)
  • Sep 11/2026 9:58AM (KEN) ROUGH IN: DEFICIENCY: Rule 12-516 – Protection plates required where wire is run less than 32 mm from edge of stud (throughout)

Along with that… 

  • The 15-15A space-saver breaker I put in for the split simplex outlet was wrong.  Each circuit must be on a different phase, the reason being that the neutral wire would handle 15 amps for each circuit, amounting in 30 amps.  I thought about this a few days ago and wondered how that worked.  It never occurred to me that I need a 2-pole breaker with each circuit on a different phase.  Again, Ryley is a helpful fellow. 

Some of the work was done yesterday and some today.

So, here goes! 

Read more

2nd floor work begins (again)

The second floor is rented for Sept. 31, 2026.  I’d best get a move-on. 

I priced out a water heater from Home Depot.  I think it may be too tall.  I’ll have to think on it. 

The entrance, stairway, and all the rooms are chocked full of stuff that needs to be moved, removed, organized, or used. 

We’re almost done!  (Not!) 

Read more

stuff comes out, stuff goes in

In preparation of the main floor, the mudroom had to be emptied of upstairs appliances.  The old range is now outside, and the new one was taken up.  It was brought up the stairs end-over-end and ended up up-side-down in the bedroom. 

The old refrigerator (a tiny apartment sized one) is now in the shed, but the new one is still in its box in the entrance.  We don’t want to overcrowd the upstairs with stuff until more work is done. 

A book shelf used for tools was brought up, but nothing else will be done until the main floor is complete.