ceiling light holes, taping and mudding, windows, ladybugs

Here is my 3rd try at placing the kitchen lighting.  <sigh> 

I moved the smoke alarm to the left.  Why?  I measured and cut the hole from the wrong side of the drywall.  Rather than patch it up and create a new hole, I moved the darned thing. 

More lighting holes. 

And now … the windows.  I’ve been dreading starting this phase, but it must be done.  Here’s the old window framing. 

Read more

begin ceiling drywall

On to the ceiling.  But first, move the boxes full of flat-pack cabinets that are in the way.

There is no rafter tie on the west end of the house.  A spacer (1″) and backing (2×4 on-the-flat) were added for mounting the ceiling drywall. 

Floyd came by and offered a badly needed 3rd set of arms. 

Read more

cleanup, organization, begin living room

I spend much of the morning and early afternoon working on cleaning up and organizing construction materials and tools.  Badly needed. 

I bought Ziplock bags from Canadian Tire to organize all the electrical and other stuff.  As it turns out, I have a surplus of outlets, switches, etc. that I didn’t know about as nothing was categorized before.

Paper floor covering went into contractor bags. SONOpan soundproofing panels, cardboard sheets, all the big, bulky stuff that got in the way was organized and stacked.  The kitchen cabinet boxes were moved out of the living room to hang drywall. 

I finally found a bracket that was needed for a 1st floor suite light.

After that, wires were stapled, outlet boxes blocked, and SONOpan soundproofing put into the wall (no pic – I forgot). 

Then the next drywall sheets were put onto the north wall of the living room and taped. 

Plans for tomorrow are to reframe and replace windows, install living room protector plates, and continue with drywall. 

A different brand of mud was used to skim coat the bedroom.  It’s not quite dry. 

backing, spacers, 45° beads, heat pump box, arc fault breakers

Before drywalling the ceiling, backing had to be installed.  There was no rafter tie at the gable ends of this house – only rafters – as the exterior 1×12 sheathing boards offered structure:  Such is balloon framing.  Thus, I added a 2×4 atop the wall’s top plate to attach drywall. 

The first piece of ceiling drywall was put up. 

However, because of various causes, the next two rafter ties (or ceiling joists) were not aligned; one was 3/4″ too high, and the next was 1-1/4″ too high.  I had to add spacers made of old lathe boards to bring the ceiling drywall down to match the rest of the ceiling.  Dave worked on other tasks like mudding seams, filling holes, and having lunch while I stuffed boards in-between the drywall and rafter ties. 

Read more

drywall day

More drywall from Home Depot.  There is a small discount if you buy 20 or more sheets (like 1-1/2 sheets free). 

Protection plates were added to the wiring before drywall goes up.

Lighting wires were stapled in the ceiling. 

The 6-mil poly vapour barrier was taped around cuts, holes, and seams. 

The first ceiling drywall sheets were put up, complete with light holes. 

The bulk of the drywall sheets were loaded into the main floor suite mudroom for storage as there is no space upstairs for these just yet. 

electrical upgrades to code

The inspector was by today, looking at the work previously done and, thankfully, on the same permit, did a rough-in inspection.  He was quite an agreeable fellow, addressing all my questions.  So was Ryley, the electrician from Passey Electric.  He found some deficiencies. 

  • Sep 11/2026 10:10AM (KEN) ROUGH IN: Range box and dryer box needs to have a second support. KF
  • Sep 11/2026 10:11AM (KEN) ROUGH IN: Plug in kitchen area should be taken out on opposite side of panel. KF
  • Sep 11/2026 10:13AM (KEN) ROUGH IN: Rough in of the upper unit was inspected with noted deficiencies. KF
  • Sep 11/2026 10:15AM (KEN) ROUGH IN: 3 heat pumps and 2 baseboard heaters are being installed. KF
  • Sep 11/2026 10:16AM (KEN) ROUGH IN: Fire alarm cable going downstairs to be completed. KF
  • Sep 11/2026 10:05AM (KEN) ROUGH IN: DEFICIENCY: Rule 12-3010 (2) – Gangable boxes require a second support between studs ( could be factory boxes2 gang)
  • Sep 11/2026 9:58AM (KEN) ROUGH IN: DEFICIENCY: Rule 12-516 – Protection plates required where wire is run less than 32 mm from edge of stud (throughout)

Along with that… 

  • The 15-15A space-saver breaker I put in for the split simplex outlet was wrong.  Each circuit must be on a different phase, the reason being that the neutral wire would handle 15 amps for each circuit, amounting in 30 amps.  I thought about this a few days ago and wondered how that worked.  It never occurred to me that I need a 2-pole breaker with each circuit on a different phase.  Again, Ryley is a helpful fellow. 

Some of the work was done yesterday and some today.

So, here goes! 

Read more

2nd floor work begins

The second floor is rented for Sept. 31, 2026.  I’d best get a move-on. 

I priced out a water heater from Home Depot.  I think it may be too tall.  I’ll have to think on it. 

The entrance, stairway, and all the rooms are chocked full of stuff that needs to be moved, removed, organized, or used. 

We’re almost done!  (Not!) 

The panel needs improvements, mostly to get up to code.  Protector plates (“bang plates”) were added to various walls. 

Do I clean up or start construction?  I began drilling holes in the hinge for the storage area under the landing. 

Cleanup won out. 

stuff comes out, stuff goes in

In preparation of the main floor, the mudroom had to be emptied of upstairs appliances.  The old range is now outside, and the new one was taken up.  It was brought up the stairs end-over-end and ended up up-side-down in the bedroom. 

The old refrigerator (a tiny apartment sized one) is now in the shed, but the new one is still in its box in the entrance.  We don’t want to overcrowd the upstairs with stuff until more work is done. 

A book shelf used for tools was brought up, but nothing else will be done until the main floor is complete. 

reasoning for renovations

I have some explaining to do.  The reasons renovations to the main floor suite were started in the first place were 

  • 1st floor suite bathroom was cut across by 2nd floor stairway (duck your head!) 
  • sloped floor 
  • 2nd floor suite had stairs so steep that a mountain goat couldn’t climb them (although this was not tested with real mountain goats) 

Some other reasons were 

  • no insulation at all – just bricks acting as heat sinks (not even structural) 
  • no bedroom or living room ceiling lights 
  • bad location of bedroom doors 
  • bad windows
    • BR1 had a window opening into the front porch – no fresh air, not to mention illegal as all hell as there was no means of egress
    • BR2 had a tiny, leaky awning window 
    • BR3 had a large, leaky window 
    • living room window leaked, would not close 
  • dated, painted 1960s panelling 
  • no 36-inch egress doors 
  • and many, many more